Finished two-storey brick rear extension by JonesBuild, with French doors on the ground floor and a window above Two-storey rear extension by JonesBuild

House extensions in Gloucester and Gloucestershire

Single and two-storey extensions built from the ground up by Steve Jones and his team: groundworks, brickwork, steels and roof, through to a finished room you can actually use.

Building in Gloucestershire since 2007 · 9.8/10 average across 83 Checkatrade reviews, 2016–2020

One builder, the whole job

What JonesBuild handles on an extension

Most extensions need several trades and some structural work. Steve runs the build and does the building work himself with his team, so you’re not left coordinating it.

Out of the ground

  • Taking down old lean-tos and clearing the site
  • Foundations and groundworks
  • Blockwork and brickwork

Structure and sign-off

  • Steels (RSJs) installed to your structural engineer’s calculations
  • Knocking through into the existing house, properly propped
  • Liaising with Building Control through the build

Roof to finished room

  • Flat and pitched roofs, rooflights and roof lanterns
  • Plastering and making good
  • Kitchens, bathrooms and utility rooms inside the new space
Real job · start to finish

A two-storey rear extension in Cheltenham, from shell to finished

The same extension, photographed on site as it went up: the brick shell under scaffold, then the gable and French doors, then finished.

Two-storey brick extension shell under scaffolding
DuringBrick shell up, under scaffold
The same extension with the gable built and French doors fitted, scaffold down
DuringGable built, French doors in
The finished two-storey rear extension with the ground cleared
FinishedTwo-storey rear extension, finished
The part you don’t see afterwards

The structural side, done properly

Most extensions open into the existing house, which means taking out part of a load-bearing wall. Steve props the structure, puts the steel in to your structural engineer’s calculations and works with Building Control, whose inspectors check the work at key stages.

New extension foundations with blockwork up to damp-proof course level and membrane laid
Foundations and blockwork up to damp-proof course
New steel over a rear-wall opening, supported on props and strongboys
New steel over a rear-wall opening, propped
Boxed beam over a new opening from the house into a rear extension
Boxed beam over the opening into a new extension

Other extensions JonesBuild has built

Every house is different, so no two extensions come out the same.

Finished single-storey rear extension with sliding doors, rooflights and new patio

Lean-to replaced with a kitchen and bathroom extension

The old lean-to came down and a single-storey rear extension went up in its place, finished with rooflights, sliding doors and a new patio.

See it before, during and after
Stone-faced single-storey rear extension with roof lantern and French doors

Stone-faced single-storey rear extension

Faced to suit the house, with a roof lantern for light and French doors onto the garden.

Finished kitchen-diner with grey Shaker-style units and a wooden-topped island

Kitchen and diner extension, finished inside

Built and then finished as a working room, with the kitchen fitted.

How an extension job runs

Every job is different, but this is the usual order of things.

  1. Call or send photos

    Ring Steve or use the quote form. Photos of the back of the house and a rough idea of the size you want help a lot.

  2. Site visit

    Steve comes out, looks at the house, the ground and the access, and talks through what you want from the space.

  3. Written quote and start date

    You get a clear written quote and a start date. It’s also made clear what needs to be in place before work starts, such as drawings, approvals or an engineer’s calculations.

  4. Groundworks and shell

    Anything old comes down, the foundations go in, then the walls, roof and windows. Building Control inspect at the key stages, and you’re kept up to date as it goes.

  5. Opening up

    The opening into the house is made and the steel goes in to the engineer’s calculations, usually once the new part is weathertight.

  6. Finishing and handover

    Plastering, making good and any kitchen, bathroom or utility work, then Building Control’s final inspection where it applies and a clean, tidy site.

Reviews on Checkatrade

Historic customer reviews from 2016–2020, when JonesBuild also traded as JCB Property Services.

JonesBuild has 5 verified Checkatrade reviews for extension work, and all five scored 10/10.

9.8/10

Our average of the scores on all 83 Checkatrade reviews, 2016–2020. Checkatrade marks 69 of the 83 as verified.

Extension questions people actually ask

Straight answers, but where it depends on your house, we say so.

Do I need planning permission for an extension?

Not always. Many single-storey rear extensions can be built under permitted development rights, but that depends on the size and height, the type of house, whether it’s been extended before, and whether it’s listed or in a conservation area. Two-storey extensions are more likely to need permission. Check with your local council, or apply for a Lawful Development Certificate if you want it confirmed in writing before you build.

Do I need Building Regulations approval?

Almost always, yes. Building Regulations are separate from planning and cover things like foundations, structure, insulation, drainage and fire safety. Building Control inspect the work at stages during the build. JonesBuild liaises with Building Control throughout; who makes the application depends on the job and is agreed before work starts.

Will I need a structural engineer?

If the extension involves steels, taking out part of a load-bearing wall or unusual foundations, usually yes: Building Control will want calculations from a structural engineer. Steve builds to those calculations. A simpler design may need less, so it depends on the job.

Can we stay living in the house during the build?

Most people do. A lot of the early work happens outside, but expect noise, dust and some disruption, especially when the opening into the house is made. If the extension replaces your kitchen or bathroom, there may be a spell without one, so it’s worth talking through at the site visit how that will work for your job.

How long does an extension take?

It depends on the size, the ground, the design, the weather and lead times for things like windows and steel, so there’s no honest one-size answer. Your quote comes with a start date, and you can ask Steve at the site visit for a realistic idea of the programme for your job.

What if we share a wall or boundary with the neighbours?

If you’re building on or near a boundary or a shared wall, the Party Wall etc. Act 1996 may apply, which means giving your neighbours notice before certain work starts. Check early, because notice periods can affect your start date.

Can you finish the inside as well?

Yes. As well as the building work, JonesBuild does plastering, kitchens and bathrooms, so the new space can be finished, not just built.

How much does an extension cost?

Every extension is different, so any figure here would be a guess. Send Steve a few photos and rough sizes and you’ll get a proper written quote.

Get a quote for your extension

Tell Steve what you have in mind. Photos of the back of the house and rough sizes help him price it properly.

or call Steve on 07739 506070

We only use your details to reply to your enquiry. How we use your details