Finished kitchen-diner with dark grey units, oak worktops, an island with stools, a herringbone floor and an original pine larder door Finished kitchen-diner, Gloucester

Kitchen renovations in Gloucester and Gloucestershire

Already bought your kitchen? JonesBuild will fit it. Want one supplied as well? We can do that too. Either way, the room around it is put right: strip-out, floors, plumbing, plastering and decorating.

JonesBuild established 2007 · Steve: 25+ years’ construction experience

Your kitchen, or one we supply

Fit only, or supply and fit

Some customers have already chosen and bought their kitchen. Others would rather we sorted it. JonesBuild works either way.

Fit only

You’ve bought the kitchen. JonesBuild fits it, and does the work the room needs around it, from the strip-out to the decorating.

Supply and fit

JonesBuild can supply the kitchen as well as fit it, and do the same work around it. Talk it through with Steve at the site visit.

What’s involved

What a full kitchen renovation involves

A new kitchen is often more than new units. This is the work that typically goes into a full renovation, in roughly this order. Not every kitchen needs all of it.

  1. Strip-out

    The old kitchen comes out, and the room is taken back as far as it needs to go.

  2. Floors

    Where the floor needs it, it’s dug out and a new base laid, so the new kitchen sits on a sound, level floor.

  3. Plumbing and electrics

    Plumbing for the sink and kitchen is part of the job. Electrical work can be arranged as part of the job.

  4. Plastering and making good

    Walls are plastered and made good, so the new kitchen goes in against clean, flat walls.

  5. Units, worktops and sink

    The units and worktops are fitted, and the sink is set in and plumbed.

  6. Flooring and decorating

    New flooring goes down, such as herringbone or LVT, and the room is decorated, wallpaper included.

Real job · Gloucester

A Gloucester kitchen-diner, from strip-out to finished

JonesBuild did this one throughout: stripping out the old kitchen, digging out the floor and laying a new base, the plumbing, plastering and making good, fitting the new units and worktops, laying the herringbone floor, and the decorating, including a wallpapered feature wall.

The old kitchen: white units, terracotta floor tiles and a washing machine under a fluorescent strip light
BeforeThe old kitchen
The finished kitchen-diner: dark blue island, oak worktops, a herringbone floor and a wallpapered feature wall
FinishedThe same room as a kitchen-diner

How it got there

  1. The kitchen stripped out, with the old floor coverings lifted and an old fireplace still in the chimney breast

    1 · Strip-outOld kitchen out, floor coverings up

  2. The floor dug out down to the ground beneath, with the walls hacked back

    2 · Floor dug outReady for a new base

  3. The new floor base laid and the walls plastered, with a glazed panel door at the far end

    3 · New baseNew floor base, walls plastered

  4. New kitchen base units going in with an oak worktop on top, the floor protected

    4 · Units inBase units and worktop going in

  5. Dark blue base units with a sink set into the oak worktop under the window

    5 · Sink runSink in under the window

  6. A newly hung dark botanical wallpaper on one wall beside a white panel door

    6 · Feature wallWallpaper hung

  7. Herringbone flooring being laid up to the skirting and a tall unit

    7 · HerringboneNew floor going down

  8. The finished island with an oak top in front of the sink run and dark units

    8 · FinishedIsland and sink run

The same room also appears on our refurbishments page, from the ceiling down: taking a whole room back to the joists

Real job · Gloucester

A Gloucester galley kitchen, up to the fit

The old galley kitchen was stripped out, then the walls were plastered, made good and decorated. JonesBuild fitted the new units and worktops and a Belfast sink with its plumbing. The floor was then levelled ready for new LVT flooring, which JonesBuild laid. Any gas work was done by a Gas Safe registered engineer.

  1. The old galley kitchen with pine-effect units and a tiled floor, looking towards French doors

    1 · BeforeThe old galley kitchen

  2. The galley kitchen with the old units removed and the tiled splashback and services exposed

    2 · Strip-outOld units out

  3. The long kitchen wall freshly plastered, with the floor protected

    3 · PlasteredWalls plastered

  4. The empty galley kitchen painted sage green, with the floor protected, looking towards French doors

    4 · DecoratedWalls painted

  5. Cream shaker-style units being fitted along both sides of the green galley kitchen

    5 · Units going inNew units being fitted

  6. A white Belfast sink set into an oak worktop above a cream shaker unit

    6 · Belfast sinkSink set into the worktop

  7. The galley kitchen with cream units, oak worktops and the Belfast sink fitted, and a shiny self-levelled floor ready for LVT

    7 · Ready for the floorUnits, worktops and Belfast sink in. The shiny floor is self-levelling compound, ready for the LVT.

The kitchen during the works, with the original back wall opened up and bare brick showing around the opening, new units wrapped in protective film
The original back wall being opened into the new extension, on the Gloucester kitchen-diner above
Opening up

Opening your kitchen into an extension or the next room

Want the kitchen to open into an extension or the room next door? On the Gloucester kitchen-diner above, JonesBuild also opened the original back wall through into the new extension.

If the wall is load-bearing, it’s structural work, and that has its own page.

Living with the work

How long will I be without a kitchen?

Honestly, it depends on what’s being done. Swapping units in a room that’s already in good shape is a very different job from one that includes the floor, the walls or opening up.

  • Expect some disruptionThere will be dust and noise, and a spell when the kitchen is out of use.
  • Talked through up frontAt the site visit, Steve can go through the order of work and how long the kitchen is likely to be out of action, so you can plan around it.
  • No guesswork on priceYou get a proper written quote once Steve has seen the room.

How a kitchen job runs

Every kitchen is different, but this is the usual order of things.

  1. Call or send photos

    Ring Steve or use the quote form. Photos of the kitchen as it is now, and the kitchen you’ve chosen if you already have one, help a lot.

  2. Site visit

    Steve looks at the room and talks through fit only or supply and fit, what else the room needs and the order of work.

  3. Written quote and start date

    You get a clear written quote and a start date.

  4. Strip-out and preparing the room

    The old kitchen comes out and the floor, plumbing and walls are put right. Electrical work can be arranged as part of the job.

  5. Fitting and finishing

    Units, worktops and sink go in, then the flooring and decorating, and the room is left clean and tidy.

Reviews on Checkatrade

Historic customer reviews from 2016–2020, when JonesBuild also traded as JCB Property Services.

9.8/10

Our average of the scores on all 83 Checkatrade reviews, 2016–2020. Checkatrade marks 69 of the 83 as verified.

Kitchen questions people actually ask

Straight answers, but where it depends on your house, we say so.

Will you fit a kitchen I’ve already bought?

Yes. JonesBuild fits kitchens that customers have bought themselves, and can do the work the room needs around it, from the strip-out to the decorating.

Can you supply the kitchen as well?

Yes. JonesBuild can supply the kitchen as well as fit it. Talk it through with Steve at the site visit.

Do you do the plumbing and electrics?

The plumbing for the sink and kitchen is part of the job. Electrical work can be arranged as part of the job.

Can you move or connect my gas hob or cooker?

Any gas work is done only by a Gas Safe registered engineer. If your kitchen has gas, mention it when you get in touch and Steve will talk it through with you.

Do you do the floor, walls and decorating too?

Yes. That can include digging out a floor and laying a new base where it’s needed, new flooring such as herringbone or LVT, plastering and making good, and decorating, wallpaper included.

Can you knock my kitchen through into the next room or an extension?

Yes. If the wall is load-bearing, it’s structural work: see our page on structural alterations. If you’re thinking of building out for a bigger kitchen, see house extensions.

How long will I be without a kitchen?

It depends on what’s involved, so any figure here would be a guess. Steve will go through the order of work and how long the kitchen is likely to be out of use at the site visit.

How much does a new kitchen cost?

It depends on the room, whether you’re supplying the kitchen or we are, and what else needs doing, so any figure here would be a guess. Send Steve a few photos and you’ll get a proper written quote with a start date.

Get a quote for your kitchen

Tell Steve about the kitchen: fit only, supply and fit, or a full renovation. Photos of the room as it is now help him price it properly.

or call Steve on 07739 506070

We only use your details to reply to your enquiry. How we use your details